Construction

Civil Craft Operator Foreman - South Valley

Mortenson

Nevada, Not Specified · United States

Operator Foreman

SUMMARY

Mortenson is currently seeking an Operator Foreman that will be responsible for operating heavy equipment as directed and specified while adhering to all rules and regulations as mandated by Mortenson safety policies and procedures. Plans, organizes, and directs operators based on the project and state and federal requirements.

RESPONSIBILITIES

  • Operate equipment such as blade, dozer, loader, scraper, forklift/telehandler, crane, bobcat/skid-steer, boom lifts/aerial lifts, and roller
  • Follow prescribed safety regulations and maintain clear and orderly housekeeping
  • Perform routine maintenance, observe equipment operation, and detect malfunctions
  • Follow work plans and pre-task cards; establish and adjust work sequences to meet schedules
  • Assist in scheduling and estimating worker-hour requirements; analyze and resolve work problems
  • Ensure crew timecards are filled out; supervise, coordinate, and direct work of operators
  • Build relationships with diverse backgrounds and organizational levels; lead by example, provide coaching and feedback, and manage performance
  • Perform all other duties as assigned

QUALIFICATIONS

  • Equipment certifications
  • Minimum two (2) years of related experience
  • Current driver's license with proper classification and necessary endorsements as required by law
  • Strong teamwork orientation, positive attitude, professional customer service skills, and detail-oriented; ability to read and interpret safety rules, operating and maintenance instructions, and procedure manuals
  • Ability to operate equipment by moving levers, shifting gears, depressing pedals, and maneuvering steering wheels; knowledge of equipment and their uses; basic mathematical skills
  • Ability to work independently with active listening and effective communication skills, open to diverse input and feedback
  • Repetitive hand, arm, leg movements
  • Lifting, carrying, pushing, pulling: up to 50 lbs
  • Please note: this position description is not intended to be a comprehensive list of the duties and responsibilities of the position. The duties and responsibilities of this position may change without notice.

Lifting, carrying, pushing, or pulling over 50 lbs will be done with assistance of another team member or equipment.

A few benefits offered include:

  • Medical and prescription drug plans that includes no additional cost vision coverage
  • Dental plan
  • 401k retirement plan with a generous Mortenson match
  • Paid time off, holidays, and other paid leaves
  • Employer paid Life, AD&D, and disability insurance
  • No-Cost mental health tool and concierge with extensive work-life resources
  • Tuition reimbursement
  • Adoption Assistance
  • Gym Membership Discount Program

Please make note:

  • Visa sponsorship is not offered for this position.
  • Our postings are typically open a minimum of 5 days and an average of 44 days.

ABOUT MORTENSON

As a top builder, developer, and EPC (Engineering, Procurement, and Construction), our expertise spans markets like sports, renewable energy, data centers, healthcare, and more. We are builders at heart, working to ensure the built environment has a lasting positive impact.

Let's Redefine Possible

Equal Employment Opportunity

Your uniqueness brings new and creative perspectives to the team. Mortenson is committed to providing equal opportunities of employment (EOE) to all individuals, regardless of your race, religion, gender, national origin, age, veteran status, disability, marital status or any other legally protected category.

Other Items to Note

  • Mortenson reserves the right to hire any individual without legal or financial obligation on unwanted solicitations. No agency emails, calls, or solicitations are accepted without a valid agreement.
  • Must be currently legally authorized to work in the U.S. without sponsorship for employment visa status (e.g., H1B status, 0-1, TN, CPT, OPT, etc.). We are unable to sponsor or take over sponsorship of an employment Visa at this time.

Reference: 3148599245

Apply now

Continue on the employer's official application - the same link they use for every candidate.

More jobs

Find more on Avenoir Talent

This role is listed on Avenoir Talent for discovery and search. Hiring decisions and applications are handled by the employer or their chosen application system.